The Granada Hill Athletics and Aquatics Renovation Project is a new state-of-the-art athletic facility that includes a new weight room, gym, pool, dance/exercise room, and a wrestling mat room. This facility, formerly known as Petit Park, was outdated and temporarily unusable due to cracks and leaks that had developed in the pool. Renovation of the facility occurred once Measure J passed which included a new bond for the Livermore School District.
Portland Bolt manufactured the ¾” and 1½” diameter tie rod assemblies for the school. These rods were made to the A307A specification and featured #4 clevises. In addition to the assemblies, Portland Bolt also manufactured the headed F1554 Grade 36 anchor bolts with diameters of 5/8” – 7/8” and A325 bolts. Next time your project requires tie rod assemblies or anchor bolts, contact one of our sales representatives.