This 12,000 square foot facility was constructed in less than 5 months. Contractors were on a rigorous timeline in order to meet a scheduled wedding in early September. With a capacity of 500 guests, the facility was built primarily as a wedding chapel.
Portland Bolt was contacted by the timber framer to provide the tie rods and hex bolts required for the project. With nearly 800 timbers in the structure, the brace rods that Portland Bolt provided were installed to restrict lateral movement in the timber frame. The fasteners that Portland Bolt manufactured are hidden in the structure to provide a more traditional joinery style.
Portland Bolt’s ability to hot-forge headed bolts and fabricate square plates in our production facility allows us to control our lead times in order to meet strict contract deadlines. Contact Portland Bolt for any large custom construction fasteners on your next project.